Built to Fail: Why Construction Projects Take So Long, Cost Too Much, and How to Fix It

Built to Fail: Why Construction Projects Take So Long, Cost Too Much, and How to Fix It
- the Taylorist preoccupation with squeezing as much work out of workers as possible is counterproductive. Having "materials waiting on workers" is avoided at all costs over "workers waiting on materials," but we don't need to choose between these two options. When it comes to supply, we can replace "just in case" (stacking up inventory) with "just in time" (delivering supplies when and where they are needed).
- the separation of design from construction and the fallacy that design is a phase that can be "finished" has contributed to the problem. Design is an ongoing process through the life of the project.
- deployment is changing from a centralized model to a decentralized one: instead of a project situated in one location, headed by one design firm and a single lead contractor and regulated by one permit, we must contend with multiple locations and jurisdictions, governed by numerous permits, various suppliers, and a multiplicity of design firms.
- the future
PRP: 185.94 Lei

Acesta este Pretul Recomandat de Producator. Pretul de vanzare al produsului este afisat mai jos.
158.05Lei
158.05Lei
185.94 LeiLivrare in 2-4 saptamani
Descrierea produsului
- the Taylorist preoccupation with squeezing as much work out of workers as possible is counterproductive. Having "materials waiting on workers" is avoided at all costs over "workers waiting on materials," but we don't need to choose between these two options. When it comes to supply, we can replace "just in case" (stacking up inventory) with "just in time" (delivering supplies when and where they are needed).
- the separation of design from construction and the fallacy that design is a phase that can be "finished" has contributed to the problem. Design is an ongoing process through the life of the project.
- deployment is changing from a centralized model to a decentralized one: instead of a project situated in one location, headed by one design firm and a single lead contractor and regulated by one permit, we must contend with multiple locations and jurisdictions, governed by numerous permits, various suppliers, and a multiplicity of design firms.
- the future